Hazardous Material Escort Robot
Services & Support
Full-Lifecycle One-Stop Closed-Loop Service Model

Phase 1(Solution Planning & Requirements Assessment)

・On-site working condition survey for mining, energy, and municipal sectors; hardware and software selection evaluation
・Customized RUMINATE OS OpenHarmony implementation solution based on the OpenHarmony foundation
・Gap analysis and cost-timeline estimation based on industry standards and project eligibility criteria
Clear hardware/software transformation roadmap; deliver actionable project implementation and product adaptation plans
Phase 2(System Adaptation & Integration Implementation)

・RUMINATE OS hardware porting, driver adaptation, and customized industry application developmen
・On-demand deployment of pre-built mining, energy, and municipal industry components
・Seamless integration with existing customer IT/OT devices and business platforms; distributed networking configuration and debugging
Rapid OpenHarmony transformation of devices; device-edge-cloud interoperability; shorter time-to-market
Phase 3(7×24 Cloud-Edge Collaborative O&M Monitoring)

・24/7 real-time device status monitoring and system anomaly alerting
・Remote online inspection and hardware/software health statistics
・Monthly system inspections and quarterly full-device compatibility retesting
Mean Time To Detect (MTTD) system failures ≤15 minutes; proactively prevent mass device downtime risks
Phase 4(Emergency Response & Remediation Optimization)

・Tiered fault classification with minute-level response initiation
・Remote technical troubleshooting, on-site repair, and emergency patch deployment
・Root cause analysis (RCA) and hardware/software optimization remediation
Mean Time To Repair (MTTR) ≤20 minutes; minimize project downtime and development stagnation losses
Phase 5(Version Iteration & Continuous Operation Optimization)

・Quarterly operational performance analysis reports for projects and products
・System version iteration and industry component upgrades synchronized with OpenHarmony mainline
・Annual developer technical training and hands-on O&M training (≥2 sessions per year)
Continuous adaptation to new industry standards and scenarios; long-term value retention across product and project lifecycles
We Deliver on Our Promises
|
Commitment Dimension |
RACETEC SLA Metric |
| O&M Technical On-Duty | 7×24 year-round uninterrupted service,regular on-duty during public holidays |
| Fault Alert Response TimeCritical fault alerts | minute-level response; routine adaptation/operation faults: response within 30 minutes |
| Senior OpenHarmony Experts · Remote Intervention |
Instant Expert Call for Critical Project/Development Blockers |
|
On-Site Critical Fault Support (South/North/East China) |
Dense coverage in core regions; engineers on-site quickly from nearby locations |
|
On-Site Critical Fault Support (Rest of China) |
Nationwide coverage; engineers dispatched promptly from nearest location |
|
RUMINATE OS Core System Availability |
Carrier-grade high availability assurance (minimal annual cumulative downtime) |
|
Hardware/Software Adaptation Difficulty Resolution |
Dedicated technical channel for complex adaptation issues; immediate response; end-to-end follow-up until closure |
|
Critical System Bug Patch Release |
Emergency fix process for critical vulnerabilities; patch packages pushed immediately after validation |
|
Incident/Project Analysis Report |
Formal root-cause & optimization report submitted within 2 business days after major incident confirmation |
|
Customer & Developer Satisfaction (CSAT) |
Maintained at industry-leading levels |











